Wilbur-curtis Gem-12D User Manual

Browse online or download User Manual for Coffee machines Wilbur-curtis Gem-12D. Wilbur Curtis Gem-12D User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 4
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
FIND OUT MORE
ON
THE WEB.
WILBURCURTIS.COM
1
F
IND OUT MORE
ON
THE WEB.
WILBURCURTIS.COM
Gem-12D Digital Brewer – Instructions
FOR THE LATEST SPECIFICATIONS AND INFORMATION GO TO
WWW.WILBURCURTIS.COM
This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be performed by an
authorized Wilbur Curtis service center.
Do NOT immerse the unit in water or any other liquid
To reduce the risk of fire or electric shock, do NOT open top panel. No user serviceable parts inside. Repair should be done
only by authorized service personnel.
Keep hands and other items away from hot parts of unit during operation.
Never clean with scouring powders, bleach or harsh implements.
ConventionsConventions
ConventionsConventions
Conventions
WW
WW
W
ARNINGS – ARNINGS –
ARNINGS – ARNINGS –
ARNINGS –
TT
TT
T
o help ao help a
o help ao help a
o help a
void personal injurvoid personal injur
void personal injurvoid personal injur
void personal injur
yy
yy
y
Important Notes/Cautions – from the factoryImportant Notes/Cautions – from the factory
Important Notes/Cautions – from the factoryImportant Notes/Cautions – from the factory
Important Notes/Cautions – from the factory
Sanitation RequirementsSanitation Requirements
Sanitation RequirementsSanitation Requirements
Sanitation Requirements
YY
YY
Y
our Curtis our Curtis
our Curtis our Curtis
our Curtis
ADS System is FADS System is F
ADS System is FADS System is F
ADS System is F
actoractor
actoractor
actor
y Pre-Set and Ready Pre-Set and Read
y Pre-Set and Ready Pre-Set and Read
y Pre-Set and Read
y to Go… Right from the Carton.y to Go… Right from the Carton.
y to Go… Right from the Carton.y to Go… Right from the Carton.
y to Go… Right from the Carton.
Following are the Factory Settings for your interLock Coffee Brewing Systems:
• Brew • Brew
• Brew • Brew
• Brew
TT
TT
T
emperaempera
emperaempera
empera
ture = ture =
ture = ture =
ture = 200°F
• Water Bypass = • Water Bypass =
• Water Bypass = • Water Bypass =
• Water Bypass = ON - Recommended, 36 cup brew
• Brew Volume = • Brew Volume =
• Brew Volume = • Brew Volume =
• Brew Volume = Set to 36 cup vessel requirements.
• Sleep Mode = • Sleep Mode =
• Sleep Mode = • Sleep Mode =
• Sleep Mode = Off
System Requirements:
• Water Source• Water Source
• Water Source• Water Source
• Water Source 20 – 100 PSI (Minimum Flow Rate of 1 GPM)
• Electrical:• Electrical:
• Electrical:• Electrical:
• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model.
SETUP STEPSSETUP STEPS
SETUP STEPSSETUP STEPS
SETUP STEPS
The unit should be level (left to right and front to back), located on a solid counter top. Connect a water line from the water filter
to the brewer. NOTE: Some type of water filtration device must be used to maintain a trouble-free operation. (In areas with
extremely hard water, we suggest that a sedimentary and taste & odor filter be installed.) This will prolong the life of your brewing
system and enhance coffee quality.
1. A 3/8” NPT x 1/4” Flare elbow has been supplied for water line connection. Use tubing sized sufficiently to provide a
minimum of 1.0 GPM.
2. To hookup the InterLock grinder, Locate the jack labeled “Class 2 Wiring Only” on brewer and grinder. Connect the two with
the cable plug.
3. Connect the unit to an appropriate electrical power circuit.
4. Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to fill. When the water level in the
tank rises to the correct volume, the heating elements will energize automatically. With ADS Systems there is no danger
of element burnout caused by an empty tank.
5. The heating tank will require 20 to 30 minutes to reach operating temperature (200°F) as indicated by the READY-TO-
BREW indicator.
6. Prior to brewing, dispense 12 ounces of hot water through the hot water faucet.
7. Brew a cycle of at least 12 ounces, to purge the water lines of any air that may be trapped after filling.
The National Sanitation Foundation requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be moved
for cleaning underneath.
2. In some areas an approved backflow prevention device may be required between the brewer and the water supply.
BREWING INSTRUCTIONSBREWING INSTRUCTIONS
BREWING INSTRUCTIONSBREWING INSTRUCTIONS
BREWING INSTRUCTIONS
1. Brewer should be ON (Confirm at rear toggle switch, then press the ON/OFF button). Ready-to-Brew should be ON.
2. Place an empty Satellite on the warmer deck, under the brewcone and press the warmer switch.
6. Press Brew button.
Brewing will begin
immediately.
WW
WW
W
ILBURILBUR
ILBURILBUR
ILBUR
C C
C C
C
URTISURTIS
URTISURTIS
URTIS
C C
C C
C
OMPOMP
OMPOMP
OMP
ANYANY
ANYANY
ANY
, I, I
, I, I
, I
NCNC
NCNC
NC
..
..
.
WILBUR CURTIS COMPANY
Montebello, CA 90640
CAUTION: CAUTION:
CAUTION: CAUTION:
CAUTION: DO NOT
connect this brewer to
hot water. The inlet valve
is not rated for hot water.
CAUTION: CAUTION:
CAUTION: CAUTION:
CAUTION: Please use
this setup procedure
before attempting to use
this brewer. Failure to follow the
instructions can result in injury or
the voiding of the warranty.
WARNINGWARNING
WARNINGWARNING
WARNING TO AVOID
SCALDING, Do not
remove brewcone while
brew light is flashing.
ISO 9001 REGISTERED
C
WARNING HOT LIQUID,
Scalding may occur.
Avoid splashing.
IMPORIMPOR
IMPORIMPOR
IMPOR
TT
TT
T
ANTANT
ANTANT
ANT
::
::
:
Equipment to be
installed to comply with
applicable federal, state, or local
plumbing/electrical codes having
jurisdiction.
5. Transfer filled
brewcone to
brewer.
3. Place a clean filter
into the brewcone.
4. Fill brewcone with
ground coffee.
Page view 0
1 2 3 4

Summary of Contents

Page 1 - Montebello, CA 90640

FIND OUT MOREON THE WEB.WILBURCURTIS.COM1FIND OUT MOREON THE WEB.WILBURCURTIS.COMGem-12D Digital Brewer – InstructionsFOR THE LATEST SPECIFICATIONS AN

Page 2 - PROGRAMMING

PROGRAMMING ONLY REQUIRED IF FACTORY SETTINGS MUST BE CHANGEDSTEPS TOPROGRAMMING2IMPORTANT – Before entering the program mode, allow the unit to reach

Page 3 - DIAGRAMS

3PARTSDIAGRAMSGEM-12D 1 2 3 4 5 6 6A 7 8 91011121314151617181920212223242526272829303132WC-5421WC-3357WC-5423WC-38310WC-37102WC-1809WC-2912B

Page 4

FOR THE LATEST SPECIFICATION INFORMATION GO TO WWW.WILBURCURTIS.COM42/21/02. 10.0 . edr 3279 rev NC7/30/03 . 12.9 . edr 6010 rev APrinted in U.S.A.

Comments to this Manuals

No comments