1
Symbols
WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory
Sanitation Requirements
CAUTION: DO NOT
connect this brewer to hot
water. The inlet valve is
not rated for hot water.
CAUTION: Please use
this setup procedure
before attempting to use
this brewer. Failure to follow the
instructions can result in injury or the
voiding of the warranty.
Model
•D1000GT
3. Connect the unit to electrical outlet with appropriate amperage rating (see serial tag on machine).
4.Oncepowerhasbeensuppliedtotheunit,ipthetoggleswitchtothe‘ON’position(locatedontherearof
theunit),thewatertankwillbegintoll.Whenthewaterlevelinthetankreachestheprobe,theheating
element(s) will turn on.
5. Water in the heating tank will require approximately a half hour before reaching operating temperature (factory
settingof200°F).Whereapplicable,turnontheUniversalControlModule(UCM).Whentheunitreaches
operating temperature, it will display “READY TO BREW”.
Wilbur Curtis Company, inC.
ServiceManual–D1000GTAirpotBrewer
Important Safeguards & Symbols
This appliance is designed for commercial use. Any servicing other than cleaning and preventive maintenance
should be performed by an authorized Wilbur Curtis service technician.
•DoNOTimmersetheunitinwateroranyotherliquid
•Toreducetheriskofreorelectricshock,doNOTopenservicepanels.Nouserserviceablepartsinside.
•Keephandsandotheritemsawayfromhotsurfacesofunitduringoperation.
•Nevercleanwithscouringpowders,bleachorharshchemicals.
The Curtis G3 airpot brewer is Factory Pre-Set and Ready to Go… Right from the Box.
Following are the Factory Settings for Curtis airpot brewers:
•BrewTemperature=200°F
•BrewVolume=Settovesselrequirements(75oz).
System Requirements:
•WaterSource20–90PSI(minimumowrateof1GPM)
•Electrical:Seeattachedschematicforstandardmodelorvisitwww.wilburcurtis.comforyourmodel.
Setup Steps
1. The unit should be level (left to right - front to back), on a secure surface.
2. Connectthewaterlinetothewaterinletttingontherearoftheunit.Watervolumeowtothemachine
shouldbeconsistent.Usetubingsizedsufcientlytoprovideaminimumowrateof1GPM.
NOTE:Awaterltrationsystemmustbeusedtohelpmaintaintrouble-freeoperation.Air must be purged
from the cartridge prior to connection to equipment. In areas with extremely hard water, we highly
recommendtheuseofaCurtisapprovedwaterlter.Forourfulllineoflters,pleaselogontowww.wilbur-
curtis.com.
NSF International requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) is required so that the unit
can be moved for cleaning.
2. Thisunitmustbeinstalledwithadequatebackowprotectiontocomplywithapplicablefederal,stateand
local codes.
3.Waterpipeconnectionsandxturesdirectlyconnectedtoaportablewatersupplyshallbesized,installed
andmaintainedinaccordancewithfederal,state,andlocalcodes.
Forthelatestspecicationsandinformationgotowww.wilburcurtis.com
Technical Support: 1-800-995-0417 M-F 5:30am-4:00pm PT
ISO 9001:2008 REGISTERED
WILBURCURTISCO.,INC.
6913 West Acco Street
Montebello,CA90640-5403
For the latest information go to
www.wilburcurtis.com
Tel: 800-421-6150
Fax: 323-837-2410
Comments to this Manuals