Wilbur-curtis GEM-120A User Manual

Browse online or download User Manual for Coffee machines Wilbur-curtis GEM-120A. Wilbur Curtis GEM-120A User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
C
Service Manual – GEM-120A Satellite Brewer
Wilbur Curtis Company, inC.
ISO 9001:2008 REGISTERED
WILBUR CURTIS CO., INC.
6913 West Acco Street
Montebello, CA 90640-5403
For the latest information go to
www.wilburcurtis.com
Tel: 800-421-6150
Fax: 323-837-2410
3. Connect the unit to electrical outlet with appropriate amperage rating (see serial tag on machine).
4. Once power has been supplied to the unit, ip the toggle switch to the ‘ON’ position (located on the rear of the unit), the
water tank will begin to ll. When the water level in the tank reaches the probe, the heating element(s) will turn on.
5. Water in the heating tank will require approximately a half hour before reaching operating temperature (factory setting
of 200°F). When the water temperature in the heating tank is ready, the green "BREW WHEN LIT" light will come on.
NSF International requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) is required so that the unit
can be moved for cleaning.
2. Thisunitmustbeinstalledwithadequatebackowprotectiontocomplywithapplicablefederal,stateand
local codes.
3.Waterpipeconnectionsandxturesdirectlyconnectedtoaportablewatersupplyshallbesized,installed
andmaintainedinaccordancewithfederal,state,andlocalcodes.
Symbols:
WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory
Sanitation Requirements
This equipment is designed for commercial use. Any servicing other than cleaning and routine maintenance should be
performed by an authorized Wilbur Curtis Company Service Technician.
DO NOT immerse the unit in water or any other liquid
To reduce the risk of re or electric shock, DO NOT open service panels. There are no user serviceable parts
inside.
Keep hands and other items away from hot areas of the unit during operation.
Never clean with scouring powders or harsh chemicals.
INSTALLATION
This Curtis unit is pre-set and ready to go from the factory.
Factory settings for this unit are:
• Brew Temperature = 200°F
• Brew Volume = Set to vessel requirements (1 Gallon).
System Requirements:
• Water Supply 20 – 90 PSI (minimum ow rate of 1 gpm)
• Electrical: See electrical schematic.
Important Safeguards/Symbols
Forthelatestspecicationsandinformationgotowww.wilburcurtis.com
NOTE:Awaterltrationsystemmustbeusedtohelpmaintaintrouble-freeoperation.Inareaswithextremelyhard
water,wehighlyrecommendtheuseofaCurtisapprovedwaterlter.Forourfulllineoflters,pleaselogonto
www.wilburcurtis.com.Awaterltrationsystemwillgreatlyprolongthelifeoftheunitandenhancethequalityand
taste of the product.
SETUP STEPS
1. The unit should be level (left to right - front to back), on a secure surface.
2. Connect the water line to the water inlet tting on the rear of the unit. Water volume ow to the machine should be
consistent. Use tubing sized sufciently to provide a minimum ow rate of one gallon per minute.
Model:
●GEM-120A
CAUTION: DO NOT
connect the unit to
hot water supply.
The inlet valve is not rated for
hot water.
CAUTION: Follow
this setup procedure
before attempting
to use this unit. Failure to
follow these instructions can
result in injury and/or void of
warranty.
CAUTION:
Equipmentmustbe
installed to comply
with applicable federal, state,
and local plumbing/electrical
codes.
Page view 0
1 2 3 4 5 6 ... 11 12

Summary of Contents

Page 1 - Wilbur Curtis Company, inC

CService Manual – GEM-120A Satellite BrewerWilbur Curtis Company, inC.ISO 9001:2008 REGISTEREDWILBUR CURTIS CO., INC.6913 West Acco Street Montebello

Page 2 - CLEANING

- 10 -ELECTRICAL DIAGRAM – GEM120A-63

Page 3 - Pouch Cleaner

- 11 -ELECTRICALDIAGRAMGEM 5 & 8ROUGH-IN DRAWING GEM-120AROUGH-IN DRAWING GEM-3 & GEM-5

Page 4 - GEMINI120A

ECN 15040 . rev J 6/5/[email protected] 10574 . ECN 14101 . rev HECN 13180 . 5/16/[email protected]6/2013F-1903revJWILBUR CURTIS CO., INC.6913 Acco St., Monteb

Page 5

- 2 -WARNING: AVOID SCALDING Do not remove the brew cone while the brew light is ashing.BREWING1. Brewer should be ON (Conrm at rear toggle switc

Page 6 - GEMINI120APartsList

- 3 -SETTING THE WC-603-101 BREW TIMERAdjustment of the timer is made on a calibrated dial with a range from 0 to 100. This is a range of 2 to 20 minu

Page 7

- 4 -POSSIBLECAUSESOLUTIONTROUBLE SHOOTINGOpenthewaterlineandmakesurewaterowstothebrewer.Turn off brewer. Disconnect wires from water inl

Page 8

- 5 -PROBLEM: WATER NOT FLOWING FROM SPRAYHEAD.SOLUTIONPOSSIBLECAUSECheckwaterlevelintank.Ifwaterisnotowingintothetank,re-viewsteps1

Page 9

- 6 -GEMINI120APartsList82728B2563161421142024571391011122151518172326293031192122

Page 10

- 7 -BREWCONE,UNIVERSAL7.38"D.KIT,RETROFITTIMERGEM120A120VKIT,LIQUIDLEVELCONTROLSPRAYHEAD,RED(.131DIA)KIT,PROBE,ASSYWATERLEVEL

Page 11 - GEM 5 & 8

- 8 -DESCRIPTIONPARTNºINDEXNºGEM-5WC-1201WC- 114RGEM 3WC-5622WC-2102WC-2010CWC-2025WC-2007WC-1901WC-1800WC-1841WC-3705GEM 4WC-3503WC-3710212345678910

Page 12 - Product Warranty Information

- 9 -ELECTRICAL DIAGRAM – GEM120A-10

Comments to this Manuals

No comments